Next: 3.1 The general approach
3 Key steps to sensitising the planning process
|
The five key steps for conflict -sensitive planning Step 1: Define intervention objective Step 2: Define intervention process Step 3: Develop indicators Step 4: Link project to scenarios and prepare contingency plans Step 5: Design project conclusion |
- 3.1 The general approach
- 3.2 Step 1: Define intervention objective
- 3.3 Step 2: Define the intervention process
- 3.4 Step 3: Develop indicators
- 3.5 Step 4: Link project to scenarios and prepare contingency plans
- 3.6 Step 5: Designing the project conclusion - sustainability, structural change and project evolution
Next: 3.1 The general approach
© FEWER, International Alert and Saferworld, 2003. All rights reserved.
Site design and publishing system by Jez Humble.